Vanderwesten & Rutherford Associates Inc.
  • About Us
    • Team
    • In The Spotlight
  • Portfolio
    • Elementary & Secondary
    • Post-Secondary
    • Community/Municipal
    • Arts & Culture
    • HEALTH CARE
    • Long Term Care
    • EMERGENCY SERVICES
    • GOVERNMENT
    • RESIDENTIAL FACILITIES
  • Services
    • Mechanical Design
    • Electrical Design
    • Energy Modeling
    • COVID 19 & HVAC
    • Carbon Neutral & Net Zero
  • Contact
    • Connect With Us
  • Careers
    • Electrical Engineer
    • Construction and Contract Administrator
    • Mechanical Engineer
    • Mechanical Designer
    • Electrical Designer

Wilfred Laurier University Library

Picture
Project Completed:
​
2014 
Construction Value: 
$2 Million 
Client:
​Cannon Design
​Location: 
​
Waterloo, Ontario

Wilfrid Laurier University Library

The Wilfred Laurier University Library building is one of the most significant and important buildings on the Waterloo campus. The Library was originally constructed in 1965 as a three storey steel frame and reinforced concrete structure with brick veneer. 
​  
​WLU is undertaking two simultaneous projects:
Project A – Interior Master Plan
The objective of Project A is to develop a comprehensive Library master plan which should be broken into phases, such that it can be implemented over time as budget becomes available.  It is expected that the library would remain operational throughout the implementation.

Mechanical and Electrical System upgrades include:
• Fire alarm system replacement with visual notification
• Replacement of ventilation units
• Replacement of heat exchangers
• Lighting systems retrofit
• Replacement of aluminum heating piping system
• Replacement and upgrade of existing control system
• Review operation of emergency generator and elevator systems
​
Project B – Entrance Addition
It is proposed that the entrance to the library be redesigned and rebuilt.  The existing concrete stairway, ramp, and elevated podium are in very poor condition.  A structural engineering assessment has recommended replacement of the existing structure. (see attached Appendix G)  The intent of this portion of the project is to remove the existing podium structure and install a new welcoming, enclosed entrance to the facility.
Picture

​Home
Services
Team
Portfolio
​Careers
​Contact Us

​ENGINEERING FORWARD


​1-519-652-5047
(LONDON)
​
1-613-563-2100
​(OTTAWA)
​
robvdw@vreng.ca
​​
© COPYRIGHT 2019. VANDERWESTEN & RUTHERFORD INC. ​ALL RIGHTS RESERVED.
  • About Us
    • Team
    • In The Spotlight
  • Portfolio
    • Elementary & Secondary
    • Post-Secondary
    • Community/Municipal
    • Arts & Culture
    • HEALTH CARE
    • Long Term Care
    • EMERGENCY SERVICES
    • GOVERNMENT
    • RESIDENTIAL FACILITIES
  • Services
    • Mechanical Design
    • Electrical Design
    • Energy Modeling
    • COVID 19 & HVAC
    • Carbon Neutral & Net Zero
  • Contact
    • Connect With Us
  • Careers
    • Electrical Engineer
    • Construction and Contract Administrator
    • Mechanical Engineer
    • Mechanical Designer
    • Electrical Designer