Project Completed:
2021 |
Construction Value:
$3 Million |
Client:
LGA Architectural Partners |
Location:
Meaford, Ontario |
Meaford Public Library Renovation
V&R provided mechanical and electrical engineering services for the renovation of the existing Foodland Building in Meaford, Ontario into the new public library. The project included the design of a new building interior and retrofits to the building envelope. The renovation estimate also included two phases for site development.
Mechanical Engineering services included:
Electrical Engineering Services included:
Mechanical Engineering services included:
- Commercial quality plumbing fixtures with electrical faucet
- Gas fired domestic hot water tank and recirculation pump
- Domestic piping distributions up to and including plumbing fixtures
- Sanitary & Vent, storm drainage
- Full sprinkler coverage throughout the building and fire extinguishers where required
- Refurbish existing make-up air unit and roof top unit
- Heat recovery unit for ventilation
- Air distribution c/w devices, dampers, etc.
- Testing and balancing
- Equipment and devices controls and tie-into existing BAS systems
- Demolition of existing equipment, distribution, fixtures, etc.
Electrical Engineering Services included:
- Modify and upgrade service and distribution
- Lighting fixtures
- F/A system
- Communication system
- Security system
- RFID and book security system
- AV system- infrastructure
- LEED best practice
- Site service