Vanderwesten & Rutherford Associates Inc.
  • About Us
    • Our Team
    • Awards
  • Portfolio
    • Elementary & Secondary
    • Post-Secondary
    • Community/Municipal
    • Arts & Culture
    • HEALTH CARE
    • Long Term Care
    • EMERGENCY SERVICES
    • GOVERNMENT
    • RESIDENTIAL FACILITIES
  • Services
    • Mechanical Design
    • Electrical Design
    • Infection Control
    • Carbon Neutral & Net Zero
  • Contact
    • Connect With Us
  • Careers
    • Electrical Engineer
    • Electrical Designer
    • Construction and Contract Administrator

McNab/Braeside Municipal Office & Perneel Building

Picture
Picture
Project Completed:
2019
Construction Value:
$3.9 Million
Client:
+VG Architects
Location:
​Arnprior
, Ontario

McNab/Braeside Municipal Office & Perneel Building

The Township of McNab/Braeside had retained +VG Architects and Vanderwesten & Rutherford Associates Inc. to complete architectural and engineering design services for the construction of a new Municipal Office. Additionally, renovations to the existing adjacent building (Perneel Building) was entailed in the scope of work. The new municipal office is 8,277 sq. ft. while the Perneel Building renovation is 5,183 sq. ft. Mechanically, this project includes piping and plumbing fixtures throughout, VAV terminal units and controls, ductwork, roof drains, hydronic equipment, boiler, AHUs and RTUs, grilles and diffusers and a propane tank. Electrically, this project includes exterior and interior lighting with occupancy sensors, receptacles and switch circuits, generator, voice/data outlets, thermostats throughout, electrical panels and transformers, addressable fire alarm system, remedial wiring to AHUs, and electrical power distribution.

The Municipal Office included:
  • 1 Executive office
  • 7 enclosed professional offices
  • 3 professional offices with adjacent plans rooms
  • 5 cubical spaces
  • Reception work space & counters
  • Office supply & photocopy room
  • Staff washrooms
  • Shower facilities
  • Lunchroom with kitchenette
  • 2 Large meeting rooms
  • Fire proof file storage
  • File storage room
  • 2 Storage rooms
  • 2 Coat rooms
  • Modern entrance & lobby
  • Public washrooms
  • Janitorial room
  • Council Chambers
  • Kitchenette off Council Chambers
  • Electrical/Mechanical room
  • IT equipment room

The Perneel Building renovation included:
  • ​Re-purposed for open concept, market and general assembly space
  • Upgraded building in parallel with the municipal office design
  • Washrooms and canteen facilities
  • Optimized servicing with the new municipal office building
Picture

​Home
Services
Team
Portfolio
​Careers
​Contact Us

​ENGINEERING FORWARD


​1-519-652-5047
(LONDON)
​
1-613-563-2100
​(OTTAWA)
​

[email protected]
​​
Picture
© COPYRIGHT 2019. VANDERWESTEN & RUTHERFORD INC. ​ALL RIGHTS RESERVED.
  • About Us
    • Our Team
    • Awards
  • Portfolio
    • Elementary & Secondary
    • Post-Secondary
    • Community/Municipal
    • Arts & Culture
    • HEALTH CARE
    • Long Term Care
    • EMERGENCY SERVICES
    • GOVERNMENT
    • RESIDENTIAL FACILITIES
  • Services
    • Mechanical Design
    • Electrical Design
    • Infection Control
    • Carbon Neutral & Net Zero
  • Contact
    • Connect With Us
  • Careers
    • Electrical Engineer
    • Electrical Designer
    • Construction and Contract Administrator